Jump to content
View in the app

A better way to browse. Learn more.

FengShui.Geomancy.Net

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
About Feng Shui at Geomancy.Net
Sponsored Link
 

Featured Replies

Posted

Dear Master,
Should we take the TOP (temporary occupation permit)
date as the date a property is being constructed?
Or shall we take the date the building blocks are being
erected in the condo project?
Eg. I can see my condo blocks already erected, but the
TOP date will be late 2004 or early 2005. Our period is
changing from Period 7 to 8 in early 2004. So which period
is my condo in??
Thanks.
Regards,
Sean
Posted
  • Staff

Dear Sean,
1. It is highly unlikely that your apartment falls under Period 7.
2. This is because your unit itself; does not have the necessary fittings to `qualify' as a built under Period 7 home. For the following major reasons:-
On the interior of your home
============================
2.1 Most likely, the entire flooring e.g. floor tiles has not been laid.
2.2 Most certainly; the main door has been fixed to the apartment.
Since these two activities have not been completed; it is quite `clear-cut' that if you are to apply the Flying Star Feng Shui; you should apply Period 8 to your new home.
Important: Has the roof/roof tile being completed?
==================================================
3. In addition, the most important consideration is also the roof of your building. As you had mentioned, each block is still under construction. And thus, the roof (roof and roof tile - has yet to be completed).
Para 3 - is the clearest indication that your new apartment block should (definitely) be considered as a Period 8 apartment.
Warmest Regards,
Cecil

Quote
On 12/24/2003 6:45:40 AM, Anonymous wrote:
Dear Master,
Should we take
the TOP (temporary occupation
permit)
date as the date a
property is being
constructed?

Or shall we take

Quote
the date the building blocks
are being
erected in the condo
project?

Eg. I can see my

Quote
condo blocks already erected,
but the
TOP date will be late
2004 or early 2005. Our period
is
changing from Period 7 to 8
in early 2004. So which
period
is my condo
in??

Thanks.
Regards,
Sean

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.
Sponsored Link
 

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.